84-ID, 171-ECB, Roer River Crossing (Linnich Germany)

Duren-Germany-1944-Building-Bridges

Engineer’s Report of the Roer River crossing at Linnich, Germany
Scope : A report of the planning, preparation, and crossing phases in which the 171st Engineer Combat Bn, XIII Corps, was involved while in direct support of the 84th Infantry Division in its assault crossing of the Roer River at Linnich, Germany. Period covered : Dec 2 1944 to Feb 24 1945; Lt Col Charles R. Keasy
171st Engineer Combat Battalion, Commanding

Linnich-Germany

Continue reading

Average Rating
0 out of 5 stars. 0 votes.